Design and Installation of Evaporative Coolers

Guddu Gas Turbine Power Station, Pakistan

A project of USAID and Zelin

Immediate Boss: Nadeem Ahad

My designation: Senior I&C Engineer

 

  • Designed, installed and commissioned the control system of cooling water circuit for the evaporative coolers, using PLCs of Honeywell. Studied the process requirement, temperature variations during the year and the documentation standards of the client to keep consistency.

  • Commissioned the system under a very tight schedule of 48 hours and achieved the target. This resulted in timely billing and received Provisional Acceptance Certificate from the client.

 

 

© 2001 All Rights Reserved