Result oriented

Proven Leadership Strengths

Demonstrated Organizational Abilities

Good Interpersonal Skills

Multi-cultural Experience

Fifteen years of progressively increasing responsibilities in Engineering and Project Execution with expertise in

  • Control logic design 

  • System analysis and optimization 

  • Specification preparation 

  • Productivity improvement 

  • As-built documentation 

  • Functional testing 

  • Operation & maintenance manuals 

  • Procedures and Control documents in accordance with safety standards 

  • Teaching, training and customer support

Experienced on;

  • Honeywell systems TDC3000, Bailey Infi90 & Net90 systems and ABB Dekontik-K. 

  • System integration and networking using Windows operating systems.

  • Pre-commissioning tests and automation.

Accomplishments

  • Designed, installed and commissioned the control system of cooling water circuit for the evaporative coolers, using PLCs of Honeywell.

  • Designed an interfacing unit to connect controls of Gas Turbines with the DCS of Honeywell (TDC3000).

  • Planned, organized and executed As-Built documentation to complete 33,000 drawings.

  • Prepared switching scheme to optimize the functionality of 220kv-grid station with four busbars.

  • Performed Environmental Qualification Assessment of safety-related equipment at Nuclear Stations.

  • Acquired good knowledge of codes & standards governing design of nuclear power plant.

  • Generating Design and Detailed Engineering documents/drawings related to project.

  • Reviewed Standards, Project Specifications, Procedures, P&IDs and Control schemes etc.

  • Generated Design and Engineering documents/drawings related to Control Room and Field Instrumentation Interfacing with SRE, Vendors, QA and other support teams.

  • Performed Technical Bid Evaluation and made technical recommendations for procurement.

 
 


© 2001 All Rights Reserved